Advanced Search

Zhang Zhuo,Xiao Qifeng,Zheng Defang
(Yalong River Hydropower Development Co., Ltd., Chengdu 610051, China)

  • This paper presents a case of a cable grounding fault caused by poor workmanship in the fabrication of a cable intermediate joint. Through theoretical analysis of the test results and on-site verification, the cause of the fault was accurately identified. The paper also provides methods for locating cable grounding faults and preventive control measures, offering a reference for industry peers in solving similar problems.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return