Advanced Search

Black Start and Fault Crossing Control Method of New Energy Island Connected to Grid by Flexible DC System

  • To ensure stable grid operation, this study investigates black start and fault ride-through control methods for renewable energy islands connected via Flexible DC (FDC) systems. A comprehensive grid model integrating renewable energy units, FDC systems, and AC grids is established, with detailed explanations of components using wind farms as examples. A three-phase coordinated recovery strategy for wind-storage hybrid systems participating in receiving-side grid black start is proposed, encompassing energy storage self-start, wind turbine support, and low-frequency oscillation suppression. For onshore AC grid faults, the research analyzes power imbalance between sending and receiving ends, implementing low-load reduction for wind turbines and short-term voltage stabilization through energy-absorbing devices. A method for setting energy-absorbing resistor values is provided to enhance economic efficiency under severe faults, thereby achieving fault ride-through control for renewable energy islands connected via FDC systems. Experimental results demonstrate that the proposed method reduces bus voltage fluctuations from ±8% to within ±2.5% during black start scenarios, and improves the minimum voltage point from 0.4p.u. to 0.65p.u. in fault ride-through scenarios. Power fluctuation suppression rates increased by an average of 25.7% across 8 samples, with sample 5 achieving a 28.3% improvement. These findings validate the method′s significant effectiveness in enhancing grid resilience and stability.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return