高级检索

一种用于基于双母线切换的主变高压侧输出功率实时计算方法

中图分类号:TV741                                文献标志码:A

  • 摘要: 为解决双母线电站在机组挂接母线切换后计算每台机组主变高压侧的实时功率时,采集母线的PT值无法固定的实际问题,提供一种基于双母线切换的主变高压侧输出功率实时计算方法,通过UC630全同步测控装置的AC模块与电流互感器CT及两段母线PT相连,UC630全同步测控装置的DI模块与I刀闸和Ⅱ刀闸位置辅助节点信号相连,UC630全同步测控装置通过网络交换机和远动主机相连,远动主机通过网线与调度数据网连通,实现利用现有母线上的PT设备准确快速计算得到机组主变高压侧的输出功率。

     

    Abstract: To solve the practical problem that the PT value of the collected bus cannot be fixed when calculating the real-time power on the high-voltage side of the main transformer of each unit after the unit-connected bus switching in a double-bus power station, a real-time calculation method for the output power on the high-voltage side of the main transformer based on double-bus switching is proposed. The AC module of the UC630 full-synchronization measurement and control device is connected to the current transformer (CT) and the PTs of the two bus sections.The DI module of the UC630 full-synchronization measurement and control device is connected to the position auxiliary node signals of the No. I isolating switch and No. II isolating switch. The UC630 full-synchronization measurement and control device is connected to the telecontrol host through a network switch, and the telecontrol host is connected to the dispatching data network via a network cable. This realizes accurate and rapid calculation of the output power on the high-voltage side of the unit"s main transformer using the existing PT equipment on the bus.

     

/

返回文章
返回