全球首台700MW超超临界低温流化床机组调速系统机网试验策略综述

Overview of Machine-Grid Test Strategy for Speed Control System of the World’s First 700 MW Ultra-supercritical Circulating Fluidized Bed Unit with Low-temperature Technology

  • 摘要: 本文以全球首台700MW超超临界低温循环流化床机组机网协调试验为研究核心,通过制定标准化试验方案、精准采集机组关键运行参数、优化阀门控制逻辑、开展功率扰动仿真前置分析,系统性解决了试验过程中的核心技术难题。本次试验全过程形成的技术策略与实践经验,不仅保障了机组机网协调试验的顺利完成,也为后续同类型大型超超临界流化床机组的调试及并网试验工作提供了坚实的技术支撑。

     

    Abstract: This paper focuses on the machine-grid coordination test of the world’s first 700 MW ultra-supercritical low-temperature circulating fluidized bed (CFB) unit. By formulating standardized test schemes, accurately collecting key operating parameters of the unit, optimizing valve control logic, and conducting pre-analysis via power disturbance simulation, the core technical difficulties encountered during the test were systematically addressed. The technical strategies and practical experience accumulated throughout the whole test process not only ensured the smooth completion of the unit’s machine-grid coordination test, but also provided solid technical support for the commissioning and grid-connection tests of subsequent large ultra-supercritical CFB units of the same type.

     

/

返回文章
返回