田湾3、4号机组一次调频对核功率影响及控制研究

Research on the Influence and Control of Primary Frequency Regulation on Reactor Power of Tianwan Units 3 and 4

  • 摘要: 田湾 3、4 号核电机组在一次调频向上调节过程中存在核功率超限风险,和气一号投运后,机组由纯发电模式转为热电联产工况,运行特性更为复杂。本文分析机组一次调频配置及不同工况下的核功率约束条件,研究闭锁一次调频动作的控制策略,通过技术措施保障核安全,研究成果可为同类核电机组及工业供汽项目的核功率控制设计提供参考。

     

    Abstract: Tianwan Units 3 and 4 nuclear power units face the risk of nuclear power over-limit during the upward regulation of primary frequency regulation. After the commissioning of Heqi No.1, the units were converted from pure power generation to combined heat and power (CHP) mode, with more complex operating characteristics. This paper analyzes the units" primary frequency regulation configuration and nuclear power constraints under different conditions, studies the control strategy for locking primary frequency regulation actions, ensures nuclear safety through technical measures, and provides a reference for nuclear power control design in similar nuclear power units and industrial steam supply projects.

     

/