变电站运行方式调整后保护配置分析

Analysis of Protection Configuration After Adjustment of Substation Operation Mode

  • 摘要: 某工业园区由110kV南山变电站供电,随着用电负荷增加新建了江安变电站。江安变电站投入运行后,为了提高供电可靠性,对原变电站的运行方式进行了调整,进而需要分析核算变电站的保护定值。本文分析了两座变电站110kV电力系统的保护配置,并根据运行方式分析了相应保护的配合关系,发现因为南山变电站实际运行方式与设计运行方式不同,造成母线故障后存在保护越级跳闸的问题,并且提出了解决方案。

     

    Abstract: An industrial park is supplied by the 110kV Nanshan Substation. With the growth of power load, the Jiang'an Substation was newly built. After the Jiang'an Substation was put into operation, the operation mode of the original substation was adjusted to enhance power supply reliability, which required the analysis and calculation of the substation’s protection settings. This paper analyzes the protection configuration of the 110kV power systems of the two substations, and studies the coordination relationship of the corresponding protections in light of their operation modes. It is found that the actual operation mode of Nanshan Substation is inconsistent with the designed one, leading to the problem of protection override tripping in the event of a bus fault. Corresponding solutions are put forward accordingly.

     

/

返回文章
返回