巢湖市长江供水工程取水泵站电气设计探讨

Discussion on Electrical Design of the Pumping Station in Chaohu City Yangtze River Water Supply Project

  • 摘要: 巢湖市长江供水工程取水泵站位于马鞍山市和县,地处长江大堤堤外滩地,站内总装机6720kW。综合考虑设备布置及汛期防护要求,本站采用双沉井布置,电气设备间尺寸严重受限。针对本站特点,文章详细描述了对主变压器、高压开关柜、变频器等设备的选型方案,并规划了泵站进线电缆入站方式,为今后沉井泵站的电气设计提供参考。

     

    Abstract: The pumping station of the Chaohu City Yangtze River Water Supply Project is located on the outer beach of the Yangtze River embankment in He County, Ma’anshan City, with a total installed capacity of 6,720 kW. Considering equipment layout and flood season protection requirements, a double-caisson configuration is adopted, resulting in severely constrained dimensions for the electrical equipment rooms. In response to these characteristics, this paper elaborates on the selection schemes for main transformers, high-voltage switchgear, frequency converters, and other critical equipment. It also outlines the cable routing plan for the pumping station, providing a reference for future electrical designs of caisson-based pumping stations.

     

/