某大型水电站主变压器事故排油阀改造探讨

Discussion on Improvement of Emergency Oil Drain Valve for Main Transformer in a Large Hydropower Station

  • 摘要: 针对某水电站三菱主变压器底部事故排油阀被封堵闭锁、火灾时无法近距操作的隐患,提出保留原阀体,在其后端加装延伸管路及手动球阀的改造方案。施工涵盖管路选型、阀门安装、气密性试验及真空注油等关键工艺。改造后,排油操作转移至室外安全区域,响应时间由数分钟缩短至1分钟以内。经半年运行验证,装置密封可靠、动作有效,切实解决了事故状态下人员无法安全排油的难题,可为同类进口变压器消防改造提供参考。

     

    Abstract: In response to the hazard that the bottom emergency oil drain valve of the Mitsubishi main transformer at a hydropower station is blocked and locked, preventing close?range operation during a fire, a retrofit scheme is proposed. It retains the original valve body and installs an extended pipeline with a manual ball valve downstream. Key construction procedures include pipe sizing, valve installation, air?tightness testing, and vacuum oil filling. After the retrofit, oil draining can be performed safely outside the transformer room, reducing the response time from several minutes to within one minute. Six months of operation have verified that the device is reliably sealed and effectively actuated, successfully resolving the problem of unsafe oil discharge in emergencies. This provides a useful reference for similar fire?protection upgrades of aged imported transformers.

     

/

返回文章
返回