一起500kV GIS局部放电检测抗干扰研判案例分析

Case analysis of anti-interference research and judgment for partial discharge detection in a 500kV GIS

  • 摘要: 针对500kV GIS 超声波局放短时检测易受外部瞬时干扰造成误判的运维难题,以某 500kV 变电站出线间隔疑似局放隐患为研究对象,采用超声波、特高频双带电检测技术开展信号采集与图谱分析,通过40 min 长时定点监测、多仪器交叉校验、全域点位扫描复合方案复测,判定初次异常为外部瞬时干扰。构建 “超声 + 特高频” 同步研判机制,提出 “短时筛查 + 长时复核” 两级检测工艺与多仪器互校抗干扰方法。从检测标准化、设备全生命周期管控、现场干扰治理、智能监测升级四维度制定长效防控措施,可显著降低局放检测误判概率,为同类 GIS 带电检测与状态运维提供标准化实操方案。

     

    Abstract: Addressing the operational and maintenance challenge of misjudgment in short-term ultrasonic partial discharge detection of 500kV GIS due to external transient interference, this study focuses on a suspected partial discharge hazard in the outgoing line bay of a 500kV substation. Ultrasonic and ultra-high frequency (UHF) live detection technologies are employed for signal acquisition and spectrum analysis. Through a comprehensive approach involving 40 minutes of long-term fixed-point monitoring, multi-instrument cross-validation, and full-domain point scanning retesting, it is determined that the initial anomaly was caused by external transient interference. A synchronous analysis mechanism combining "ultrasonic + UHF" is established, proposing a two-tier detection process of "short-term screening + long-term review" along with a multi-instrument cross-validation anti-interference method. Long-term prevention and control measures are formulated from four dimensions: detection standardization, equipment lifecycle management, on-site interference mitigation, and intelligent monitoring upgrades. These measures can significantly reduce the probability of misjudgment in partial discharge detection, providing a standardized practical scheme for similar GIS live detection and condition-based maintenance.

     

/

返回文章
返回