220千伏同杆线路并线改单回增容关键技术研究及应用

Research and Application of Key Expansion Technologies for Converting 220 kV Double-Circuit Lines on the Same Tower to Single-Circuit Lines

  • 摘要: 电网中同杆架设小截面导线逐渐不能满足“N-1”或“N-2”校核要求,传统解决思路需要采用殷钢芯增容改造、拆除重建大截面线路等措施,但存在造价较高、投资浪费等问题。采用同杆并线改单回,再重新新建一回大截面线路的解决方案,不仅可以形成两回非同杆大截面线路,还节省了两侧220千伏间隔。本文通过解决并线措施需要的技术问题、对电网运行影响分析、提出保护控制策略,提出并线改单回增容方案,并通过中间段加设并线措施提升继电保护准确性,解决同杆小截面导线断面瓶颈问题。通过上述解决思路,指导电网升级改造的一种新方法,满足输电线路全寿命周期发展需要。

     

    Abstract: Small-section conductors erected on the same tower in the power grid are gradually unable to meet the verification requirements of the N-1 or N-2 criterion. Traditional solutions include capacity-increasing renovation with Invar core conductors and demolition & reconstruction of large-section transmission lines, which suffer from high construction cost and investment waste.The scheme of converting parallel lines on the same tower into a single-circuit line and constructing a new large-section line separately can not only form two non-same-tower large-section lines, but also save 220 kV bays on both sides. By addressing the technical difficulties of the parallel line reconstruction scheme, analyzing its impact on power grid operation, and proposing corresponding protection and control strategies, this paper puts forward a capacity expansion scheme of converting same-tower parallel lines to single-circuit lines. Arranging additional parallel lines in the middle section is adopted to improve the accuracy of relay protection and break the transmission bottleneck of existing small-section same-tower conductors.The proposed idea provides a novel method for power grid upgrading and renovation, and satisfies the full-life-cycle development requirements of transmission lines.

     

/

返回文章
返回