核仪表系统源量程延迟投入原因分析与优化研究

Analysis on the Causes of Delayed Activation of the Source Range in Nuclear Instrumentation Systems and Research on Its Optimization

  • 摘要: 针对核电厂堆外核仪表系统源量程延迟投入问题,为厘清故障诱因并提出优化手段,梳理中间量程探测器结构、信号流程及量程间联锁逻辑,明确探测器故障、补偿电压、电流-功率转换系数为主要影响因素。在现有补偿电压调节、参数修改、逻辑降级处置基础上,引入RNN时序模型实现源量程计数率预测,辅助投用决策。经X04、X05大修实测数据验证,模型预测偏差小于1100CPS。研究可为堆外核仪表系统故障处置与稳定运行提供理论依据和工程参考,有助于改善机组下行阶段运行效率。

     

    Abstract: Aiming at the delayed activation of the source range channel in nuclear power plant ex-core nuclear instrumentation system, this study clarifies fault inducements and proposes optimization measures. By sorting out the structure of intermediate range detectors, signal flows and inter-range interlock logic, detector faults, compensation voltage and current-to-power conversion coefficients are identified as major influencing factors. On the basis of existing countermeasures including compensation voltage adjustment, parameter modification and logic degradation, an RNN time-series model is introduced to predict source-range count rate for assisting activation decision-making. Validated by measured data from Outages X04 and X05, the model prediction deviation is less than 1100 CPS. This research provides theoretical basis and engineering references for fault handling and stable operation of ex-core nuclear instrumentation systems, and helps improve unit operation efficiency during the power-down phase.

     

/

返回文章
返回