新能源消纳背景下火电机组一次调频与AGC协调控制优化研究

Optimization of Coordinated Control Between Primary Frequency Regulation and AGC of Thermal Power Units Under New Energy Accommodation Background

  • 摘要: 针对新能源出力波动下火电机组一次调频与AGC协调不充分的问题,以某1000 MW火电机组DCS运行数据为基础,选取电网频率、有功功率、AGC指令、DEH一次调频指令、调门开度和主汽压力等变量,分析典型频率扰动过程中的响应特性。结合现场控制逻辑,对一次调频参数、AGC反向调节限制和DEH/CCS协调方式进行优化。结果表明,优化后机组响应延迟时间由9.6 s缩短至4.1 s,最大负荷变化量由8.4 MW提高至13.7 MW,AGC反向调节次数由5次减少至1次,一次调频合格率由86.7%提高至96.5%,协调控制效果明显改善。

     

    Abstract: Aiming at the insufficient coordination between primary frequency regulation and AGC of thermal power units under new energy output fluctuation, this paper takes the DCS operation data of a 1000 MW thermal power unit as the basis. Grid frequency, active power, AGC command, DEH primary frequency regulation command, valve opening and main steam pressure are selected to analyze the response characteristics during typical frequency disturbance. Combined with the field control logic, the parameters of primary frequency regulation, AGC reverse regulation limitation and DEH/CCS coordination mode are optimized. The results show that the response delay time is shortened from 9.6 s to 4.1 s, the maximum load variation is increased from 8.4 MW to 13.7 MW, the reverse regulation times of AGC are reduced from 5 to 1, and the qualified rate of primary frequency regulation is improved from 86.7% to 96.5%. The coordinated control effect is significantly improved.

     

/

返回文章
返回