高级检索

基于VB的压水堆机组装料步序变更系统

The altering system of fuel loading sequence in PWR nuclear power station based on VB

  • 摘要: 核电厂换料大修前,由于堆芯的燃料富集度匹配、堆芯反应性控制、燃料运行时长等因素,部分燃料组件会发生辐照变形,造成组件装载就位困难,需要调整装料步序以完成全部组件装料作业。当前堆芯装料步序变更主要依托Office软件人工完成,存在新燃料组件手动标记、步序调整依靠人工计算校核、工作耗时长且人因风险突出等问题。本文设计开发一套压水堆堆芯装料步序变更系统,可自动识别装载高风险燃料组件位置,完成合理装料步序的计算输出。

     

    Abstract: Before core fuel loading design for nuclear power plant refueling outage, subject to the enrichment of core fuel assemblies, reactivity control, operation time and other factors, partial fuel assemblies suffer from irradiation deformation and meet difficulty during loading. It is necessary to alter loading sequence to place all fuel assemblies into reactor core. At present, the alteration of core loading sequence is manually realized by Office software, which requires manual marking for new fuel assemblies and manual calculation & verification for adjusted loading sequence, resulting in heavy workload and high human?error risk. This paper presents a developed PWR fuel assembly loading-sequence altering system. The system can automatically identify fuel assemblies with loading risks and output optimized reasonable loading sequence.

     

/

返回文章
返回