严寒地区供热电气设备冬季稳定运行保障技术探析

Technical Analysis on Stable Winter Operation Guarantee of Heating Electrical Equipment in Severe Cold Areas

  • 摘要: 针对严寒地区供热站冬季低温、高湿、负荷突增与备用切换叠加引发的配电柜凝露、接触电阻增大、泵组过载及控制回路误动作问题,以某换热站为对象,构建环境、负荷与设备状态协同表征的低温风险分级模型,提出柜内微环境调控、泵组错峰启停、备用电源快速切换和预测性维护相结合的保障方案。运行结果显示,关键设备综合风险指数由0.63降至0.29,低温告警平均处置时间缩短约42%,表明该方案可提高供热电气系统冬季连续运行稳定性。

     

    Abstract: Abstract: In severe cold areas, low temperature, high humidity, load mutation and standby switching may jointly cause condensation in low-voltage cabinets, contact-resistance increase, pump overload and control-loop maloperation. Taking a heat-exchange station in a severe cold area as the engineering object, a low-temperature risk grading model based on environment, load and equipment status is established. A combined guarantee scheme including cabinet micro-environment regulation, staggered pump start-stop, fast standby power switching and predictive maintenance is proposed. The results show that the comprehensive risk index of key equipment decreases from 0.63 to 0.29, and the alarm response time is reduced by about 42%, which improves the continuous winter operation capability of the heating electrical system.

     

/

返回文章
返回