配电室倒闸瞬时切换方法的研究应用

Research and Application of Instantaneous Switching Method of Switchback in Power Distribution Room

  • 摘要: 针对配电网故障后配电室母线快速恢复供电的需求,提出一种适用于配电切换装置的瞬时(<100 ms)冷倒切换优化控制方式。该方式采用“高频感知-预决策-自适应执行”三层架构,通过高频同步采样(5 kHz)、滑动DFT(SDFT)硬件加速计算、卡尔曼滤波去噪、多条件预决策及开关动作时序自适应学习,突破传统冷倒操作“采样延迟-决策耗时-执行时序失配”瓶颈。实验结果表明,该算法可将冷倒切换总时间稳定控制在80~95 ms,满足GB 50053—2013对配电网供电可靠性的要求,同时通过硬互锁逻辑杜绝“合环短路”风险,为配电系统柔性自愈提供关键技术支撑。

     

    Abstract: To address the need for rapid power restoration in distribution substations after faults in the distribution network, this paper proposes an optimized control method for instantaneous (<100 ms) cold transfer switching applicable to distribution switching devices. The method adopts a three-layer architecture of "high-frequency perception - pre-decision - adaptive execution", overcoming the traditional bottlenecks of "sampling delay - decision time - execution timing mismatch" in cold transfer operations through high-frequency synchronous sampling (5 kHz), sliding discrete Fourier transform (SDFT) hardware acceleration, Kalman filtering for noise reduction, multi-condition pre-decision-making, and adaptive learning of switch action timing. Experimental results demonstrate that the algorithm can consistently maintain the total cold transfer switching time within 80~95 ms, meeting the GB 50053—2013 requirements for distribution network power supply reliability. Additionally, it eliminates the risk of "loop-closing short circuits" via hard interlocking logic, providing critical technical support for flexible self-healing in distribution systems.

     

/

返回文章
返回