高级检索

考虑负荷动态变化的大型基建项目临时供电系统容量优化配置

Capacity Optimization of Temporary Power Supply Systems for Large-Scale Infrastructure Projects Considering Dynamic Load Variations

  • 摘要: 大型基建项目施工阶段存在的负荷波动大、时变性强,使得传统静态容量配置难以兼顾安全性与经济性。为解决容量冗余与供电不足并存的问题,基于施工全周期负荷特性构建动态容量优化模型,并通过某地铁区间施工段进行仿真验证,形成随施工节奏自适应的容量配置策略。研究结果表明,该方法能显著提升负荷匹配度、供电可靠性与能耗表现,为临时供电系统精细化设计与智能化管理提供有效技术支撑。

     

    Abstract: The construction phase of large-scale infrastructure projects exhibits significant load fluctuations and strong time-varying characteristics, making it difficult for traditional static capacity configuration methods to balance safety and economy. To address the coexisting issues of capacity redundancy and power supply insufficiency, this paper develops a dynamic capacity optimization model based on the load characteristics throughout the entire construction cycle. The model is validated through simulations of a metro tunnel construction section, forming a construction rhythm-adaptive capacity configuration strategy. Results demonstrate that the proposed method significantly improves load matching, power supply reliability, and energy consumption performance, providing effective technical support for the refined design and intelligent management of temporary power supply systems.

     

/

返回文章
返回