核电厂孤岛运行叠加GCT121VV故障关闭的控制策略研究

Research on Control Strategies for Nuclear Power Plant Islanded Operation in Combination with Failure Shutdown of GCT121VV

  • 摘要: 在核电厂操纵人员模拟机培训中,模拟机教员会设置多故障叠加场景,旨在提高操纵人员对机组瞬态的响应及控制能力。对秦山第二核电厂孤岛运行叠加GCT121VV故障关闭工况进行研究,并运用秦山第二核电厂CP660全范围模拟机平台进行仿真试验,分析该工况对机组核功率、控制棒位置、最终功率整定值、蒸汽发生器水位的影响,并提出稳定机组状态的控制策略,加深操纵人员对故障叠加情况下机组状态的理解,提高分析和判断故障的能力。

     

    Abstract: In simulator training for nuclear power plant operators, simulator instructors set up multiple fault superimposed scenarios to improve operators' response and control capabilities to the transient state of the nuclear power plant. This paper conducts research on the working condition of islanding operation superimposed with GCT121VV fault shutdown in Qinshan nuclear power plant unit 2, and uses the CP660 full-scope simulator platform of Qinshan nuclear power plant unit 2 to carry out simulation experiments. It analyzes the impacts on the unit nuclear power, control rod position, final power setpoint, and steam generator water level under this working condition, and proposes control strategies to stabilize the unit state, deepen operators' understanding of the unit state under fault superimposed conditions, and improve their ability to analyze and judge faults.

     

/

返回文章
返回