高级检索

关于6 kV母线送电过程中接地告警的分析与解决方案

Analysis and Solution of Grounding Alarm During 6 kV Bus Power Transmission

  • 摘要: 在某石化企业变电所6 kV母线送电进行备自投试验,发现零序过压保护配置不合理可能会引起接地保护误告警,给正在执行送电操作的运行人员造成困扰和误判。通过理论分析和验证试验,研究了零序过压保护的配置问题、误告警原因,提出了对应解决方案,并通过实际运行验证了其有效性。

     

    Abstract: In the 6 kV parent line of a petrochemical enterprise substation, it was found that during the process of self-investment testing, it was found that unreasonable zero-sequential overvoltage protection configuration may cause the ground protection misunderstanding the police, and it will cause trouble and trouble to operators who are performing power delivery operations. Through theoretical and verification test analysis, the configuration problem and misunderstanding the reason for the alarm of zero-sequential overvoltage protection were studied, and the corresponding solutions were proposed to verify its effectiveness through actual operation.

     

/