  • 摘要: 主接线设计作为变电所设计的开端,确定了变电所内部各电气设备之间的连接方式,为后续的设备选择、布置以及保护配置等提供了明确的指导。对主接线的数据结构、设计及绘图思路、快速绘制几个方面进行了研究,通过设计绘图数据分层化,采用设计绘图“自上而下”的思想,结合模块化节点拼接与历史数据复用技术,实现牵引变电所主接线的快速绘制。

     

    Abstract: As the starting point of substation design, the main connection design determines the connection methods between various electrical equipment inside the substation, providing clear guidance for subsequent equipment selection, layout, and protection configuration. This article studies the data structure, design and drawing ideas, and fast drawing of the main connection. By designing a hierarchical drawing data and adopting the "top-down" design drawing concept, combining modular node splicing and historical data reuse technology, achieve rapid drawing of the main connection of traction substations.

     

/